Skip to content
(818) 714-7963

Electrician In Los Angeles, CA

Los Angeles is our base. Inside the city limits the power comes from LADWP and the permits from LADBS. Our base is here.

  • Power: LADWP
  • Licensed & insured · CA License #1159199
Electrician pulling wire through the open wood framing of a new addition

Working In Los Angeles

Los Angeles is where the work starts each morning. Most jobs inside the city run through two counters: LADBS for the permit and LADWP for anything that touches the meter. Knowing which of the two is holding a job up is half of keeping a project on schedule.

The housing stock is the widest in the region: hillside homes with long service runs, Spanish duplexes split into units, post-war tracts in the Valley and new ADUs in the backyards behind them. A panel that is fine in one is undersized in the next.

Utility: LADWP, outage line 1-800-342-5397. Permits: LADBS, the Los Angeles Department of Building and Safety, which takes electrical permits online.

LADWP’s Charge Up LA! rebate pays up to $1,000 for a Wi-Fi Level 2 charger and its installation, with $250 more for a dedicated meter and $500 more for Lifeline or EZ-SAVE customers. It needs a licensed electrician and a finaled LADBS permit.

A Permitted Job Inside The City Of Los Angeles

  1. Permit at LADBSMost residential electrical work up to 400 amps goes through LADBS as an express permit online, with no plan review. The contractor pulls it.
  2. Meter spot and inspectionFor a service change with overhead service, LADWP confirms where the meter goes before the inspection. The LADBS inspector then checks the work.
  3. Release and powerOn single-phase services up to 200 amps the inspector also signs off for LADWP, which reconnects the service after the electronic release.

Los Angeles Questions

Do I need a permit for electrical work in Los Angeles?

For most work beyond swapping a device, yes. LADBS issues electrical permits online, and residential work up to 400 amps without engineering usually qualifies as an express permit. The contractor pulls it.

Can an ADU share the main house’s electrical panel?

Often it can, through a subpanel fed from the main panel. Whether the main service has room depends on a load calculation of both units together.

Starting A Project In Los Angeles?

Tell us the neighborhood and what you want to add. You get the permit path and a written price before work starts.

Call now Text a photo