Skip to content
(818) 714-7963

Electrician In Pasadena, CA

Pasadena has its own utility, Pasadena Water and Power, and its own permit office. LADWP and LADBS rules do not apply here.

  • Power: Pasadena Water and Power
  • Licensed & insured · CA License #1159199
Electrician replacing old cloth-covered wiring with new cable in an attic

Working In Pasadena

Pasadena runs its own utility, Pasadena Water and Power, and its own Permit Center. Rules written for LADWP and LADBS do not apply.

Pasadena is Craftsman country. Bungalow Heaven alone has hundreds of homes from the 1900s to the 1930s. In a landmark district, moving a meter or a service mast on the street side can need a design review, so a panel job here can start with a conversation with the city.

Utility: Pasadena Water and Power, outage line 1-626-744-4673. Permits: the Pasadena Permit Center.

Pasadena Water and Power pays $600 for a Wi-Fi Level 2 charger or $200 for a standard one, applied for within 180 days of purchase. It also lists $1,000 for an upgrade to 200 amps or more that includes dedicated circuits for a Level 2 charger and an electric water heater, with one of the two installed, applied for within 180 days of the final permit.

Rewiring A Pasadena Bungalow, Step By Step

  1. Find what is liveWe trace the old circuits in the attic and crawl space and mark what still carries power.
  2. Permit CenterThe City of Pasadena issues the permit. In a landmark district, exterior changes can need a design review first.
  3. Open, rewire, patchNew grounded circuits through small openings, then the inspection, then patching.

Pasadena Questions

Is knob and tube wiring legal in Pasadena?

It is not illegal to have it. The issues are safety and insurance: no ground wire, insulation that is around 90 years old, and insurers that decline houses with it.

What does Pasadena Water and Power’s panel rebate require?

An upgrade to 200 amps or more with dedicated circuits for a Level 2 charger and an electric water heater, one of the two installed, and the application within 180 days of the final permit.

An Old Pasadena House?

We show you what is in the walls before we quote the rewiring.

Call now Text a photo